This multi-beneficial project sought to address some the physical modification of the River Chess between Latimer and Chenies Bottom. The project was made up of two parts, Flaunden Brook and Church Covert. Each section, looked to improve connectivity of the river system and associated wetland habitats. It has enhance as a minimum the rare chalk stream characteristic that make up the River Chess and its catchment.
Project Description
The river in this location, has been heavily modified in the past for milling and other purposes, resulting in a main river that is over-wide with sluggish flows and high sediment deposition.
Flaunden Brook: A winterbourne tributary of the River Chess, has been culverted and received modification effecting the natural morphology and floodplain connectivity of the area.
Church Covert: The main channel of the River Chess, due to degradation and bank erosion have lead to the creation of multiple breaches from the perched, former mill-pool, that have resulted in a significant loss of water to a side channel.
Both schemes have been identified and developed by The Chilterns Chalk Streams Project working in partnership with the River Chess Association and Chilterns Heritage and Archaeological Partnership (CHAP), plus local landowners. The project was being supported by the Environment Agency and Buckinghamshire Council, and was funded by five different funds.
Key deliverables
- 115m of new chalk stream habitat created (including a new channel and culvert removal)
- 950m of existing chalk stream habitat enhanced
- Former mill channel banks stabilised reducing risk of catastrophic failure
- 140m of bridleway improvements that will permit year-round access to 1100m of the Chess Valley Walk
- Replacement of 210m of fencing
- Replacement of x2 boardwalks
- Tree planting and marginal planting
- 2,700 m² of wetland creation
Flaunden Brook
The Flaunden Brook Restoration project has improved a degraded winterbourne chalk stream tributary of the River Chess by restoring a more natural channel form, improving floodplain connection and creating a wider mosaic of wetland, riparian and meadow habitats. The project began with the removal of 100 m of failing culvert, followed by regrading of banks and the river bed, and re-meandering to reinstate a shallow, sinuous open channel that can function more naturally during seasonal flows. Work to reinforce the ford aims protect the crossing point for vehicles from erosion and ensure access remains resilient.
In addition to the chalk stream enhancements, wetland creation of approximately 2,700 m² of new low-lying habitat to slow and store water during high-flow periods, support seasonal inundation and provide refuge for wildlife. Together, the works will reduce sedimentation and erosion, increase biodiversity, improve resilience to flooding and climate change, and deliver long-term ecological benefits for chalk stream species and associated wetland wildlife.
The heavily used footpath forming part of the Chess Valley Path has been improved by reinstating the footpath over 65m through the construction of a raised gravel path and a raised boardwalk walkway at two locations.
Funded by: DEFRA Wildlife Rich Habitats Fund, Buckinghamshire Council, Chess Smarter Water Catchment and the CCSP.
River Chess, Church Covet
An excavated new channel has be formed to connect the main River Chess to its existing side channel, creating a controlled and functional flow route between the two systems. A sectional repair of up to 80m of the left bank of the River Chess has been undertaken to address existing breaches, erosion and localised instability.
To enhance ecological value across the upstream and midstream sections, a series of large woody debris (LWD) structures have been introduced within the channel. These features will increase complexity, provide in-channel habitat, and help establish a more defined and resilient low-flow channel. Berm creation has been undertaken alongside pool riffle features to address the existing over-widened channel form.
The existing footpath (bridleway) on the left bank part of the heavily used Chess Valley Walk is largely flooded in high flows resulting in a poor experience for users and more mobilisation of sediment into the watercourse. The fence separating the footpath from the watercourse was in poor repair and further exacerbates the problem with incursion of public and dogs into the watercourse further degrading it and disturbing the water voles, a protected species. Works to improve the footpath, drainage and create a natural buffer whilst still allowing users to engage visually with the river and its wider meadow area has been completed.
Funded by: DEFRA Access for All, Chess Smarter Water Catchment, and the CCSP.